¦wiêtokrzyski Bridge
Siekierkowski Bridge
It was building from September 1998. It was opened in the 5th of October, 2000. It is 80 m high. It has two two-ways roads, two passageways and two bike-roads.
On the constructor'ssite, which is about ¦wiêtokrzyski Bridge, you'll find photos and all necessary infos.
This bridge is being constructed. It's a part of Siekierkowska Speedway. It'll be opened in September, 2002.
Constructors: Mostostal Warszawa, Warbud, Campenon Bernard. The building's chief: in¿. Jerzy Bogaczyk.
Lenght: 826 m
Height: 92 m
Building costs 200 mln z³ (50 million USD)
Updated: 14 July 2001