Default
Google

The London Tube - Central Line













Epping to Ongar (Now Disused branch of the Central Line)
Number of Stations:  3 (Also 3 stations on return journey)
Approximate Route Time:  About 10 mins
High Lights:  An open source route.  In train announcements.
Author:  Download from Ongar Route Website - Chris Rogers


Pulling into Ongar station.

IN PRODUCTION BETA TESTING
Currently:  Holland Park to Lancaster Gate
Number of Stations:  Current Public Demo - 4
Approximate Route Time:  About 8 mins
High Lights:  Very accurate representation of the Central Line track including the steep gradients and sharp curves and well depicted stations.  High Colour graphics.
Low Lights:  We've only previewed a tiny section of what looks like a very promising BVE Route!
Author:  London Underground Central Line for BVE - John Owen


"This is Holland Park "  The Westbound Central Line Train enters Holland Park Station (note our advert on the wall - thanks John!)  :)
©John Owen


This is a screenshot of the very realistic Lancaster Gate Station.
©John Owen


NEW: "This is Marble Arch" - On the approach to Marble Arch.
©John Owen

A public demo of the Central Line, with the stations you see here, can be downloaded from John's Central Line Site.

 

Back to the Homepage

 


~ Forum ~
Log In


Central Line facts from Thetube.com

The Central Line opened on 30th July 1900 as a cross-London route from Bank to Shepherd's Bush, and was extremely well patronised from the outset.

The Epping to Ongar shuttle service, which was run under contract as a steam-hauled service by British Rail until 1957, was closed in 1994.



Line Facts © Copyright 2001 London Underground Limited. All rights reserved  -  Text ©2001 James Roberts unless otherwise stated.



Acquiring image from ProHosting Banner Exchange